Leeds Bradford: £100m Regeneration Programme REGEN

Use this prefix for new threads for Leeds Bradford Airport
In respect of LBAREGEN Phase 2, do we know when the contractor will be announced? Presumably Farrans will have tendered?
No information given by LBA to the Consultative Committee but the preliminary works are due to start in February so it can't be long.

The exterior cladding on the new building doesn't seem to have progressed much, if at all, in the last week or so, at least not landside. Maybe more progress on the elevation overlooking the apron?
 
No information given by LBA to the Consultative Committee but the preliminary works are due to start in February so it can't be long.

The exterior cladding on the new building doesn't seem to have progressed much, if at all, in the last week or so, at least not landside. Maybe more progress on the elevation overlooking the apron?
No cladding visible airside yet. Roofing safety nets are slowly coming down but most activity seems to be occuring on the lowest level atm. Seeing more temporary lighting going in. More concrete being pumped to departures floor today
 
I think it is fair to say the Project Managers and Contractor knows what they are doing so as long as work continues apace then it doesn't really matter what work is being done right now. I suppose the key will be that as long as they can work predominantly inside through the winter months it will mean no delays to opening
 
It will look even more impressive once that awful bus shelter is removed as it takes up a little of the view, but yes it looks grand, exciting times!
Defo agree with that. As well as looking unsightly, it blocks the view looking out across the ramp. Hopefully we'll get some nice views across the airfield when it's finished.
 
Perhaps Blue Sky Aviation should also do a live feed from inside the new Terminal, especially through winter. That's if departing pax don't get a first hand view of windy days. Foggy days they will be ok as they won't be able to see the runway!

Joking aside, I agree this has to provide some amazing views, which in the main will be completely uneventful
 
Noticed today whilst driving past the airport that more or less all the light grey cladding is now fitted to the landside with just the pier bit remaining, next will be the darker sections and what i believe is a tinted window section stretching full length which is the part roughly 3/4th up.
 
Is the arrivals corridor going to be a temporary structure while the new CSZ is constructed? I'm guessing next summer there will need to be a temporary exit from the new arrivals facility until the CSZ is moved to its new location.
 

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

i must be a lunatic. Friday 25th Sept will see me doing a daytrip that involves me leaving my flat in Manchester at 1am and not getting back home until after midnight. All because I'm doing a Loch Ness and Scottish Highlands trip.... out of Glasgow
For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD

Trending Hashtags

Advertisement

Back
Top Bottom
✖
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.