I am certain that when the Masterplan is finally publicised, additional parking stands will be included as a high priority, BUT I hasten to add I have seen nothing to confirm this. Once they are, they will not take too long to construct. My reasoning is based purely on discussions at the Consultative Committee and the observations made by LBA, although it has to be said that even if they do expand the parking stands, it will not be very long before the airport is full again.
We all need to face up to the fact that the area of land occupied by LBA is not very big by airport standards and the land itself is not very level either, which doesn't help at all.
Muscleboy33, moving the touch down point at the 14 end of the runway is a non starter. To achieve touchdown where they do now requires a 3.5 degree glide-slope to clear the Chevin by the required height. Bringing the touch down point back nearer the Chevin end of the runway would require an even steeper approach to maintain that clearance, which I don't think will be acceptable.
Whilst we may only need 300m at the Horsforth end to make a real difference, that 300 metres includes the remains of a fairly deep reservoir that would need to be filled in, and would move the runway 300 m closer to Scotland Way, with the result that runway lighting would then be extended right into the housing area. Effectively, the likelihood of compulsory purchase of properties and the complete re-modelling of the housing area. Achievable but painful and very expensive. When the Government White Paper some years back more or less gave the nod to the runway being extended, it didn't actually consider the impact or cost of doing so. As I said previously, the cost v benefits calculations don't add up. If they don't add up for just moving the touch down point back towards Horsforth because of all the extra costs linked to the work, they certainly won't add up for a runway extension.
I think it is fair to say that LBA could easily operate to capacity (even with the additional parking stands and terminal expansion when they arrive) without any significant long haul flights because if we ever operated to our true potential on short/medium haul flights (most of which remain vastly under-served or not served at all) LBA would quickly be at capacity and with very little further expansion room - which is why LBA management are actively trying to ensure that the airport is utilised more during the day by non based a/c and not so dependent on the based a/c which by definition, are missing for most of the day.
Sadly the best we can hope for (I believe) is, another operator to Pakistan (eventually), possibly India, and Dubai (in both cases provided the right aircraft are operated) and heading West, Florida, Canada and hopefully New York - again using the right equipment. Beyond that, I can't see it happening, nor do I think LBA will be even thinking about it as long as the short and medium haul destinations remain under served.