White Heather
Elite Pro-Member
I'm surprised that airlines will consider being incentivised to go to DSA as this has happened previously and once the incentivisation ends, which it will, the same outcome is likely unless suddenly there is a surge of people wanting to book flights from there.The BBC article https://www.bbc.co.uk/news/articles/cjw09w6j992o
To me this reads like they are needing more public money to “incentivise “ airlines to even entertain going to DSA and to underwrite the significant commercial risk. Add to that it now looks the public sector will be a lot more involved in the airport then originally envisaged this is starting to move significantly away from the operating model originally envisaged in the outline business case.
If this is starting to go north of needling £150m I can see public support away from the mechanics fanatics starting to evaporate.
Since incentivisation means reduced or even non existent profit for the airport, how does the airport avoid going down the same dead end route as it did under Peel unless it's passenger numbers are significantly higher than before? It's like the same business model and they say doing the same thing expecting a different outcome is a sign of insanity.
I'm not sure either why these deluded politicians think once again, that airlines will abandon existing bases or that people will follow their favourite airline down the road should that even happen. History shows that when TUi abandoned their LBA base, in favour of the sweeteners on offer at DSA, the vast majority of LBA passengers stuck with LBA, switching to Thomas Cook, and then opening the door to Jet2.
It really is difficult to see how this will work, particularly given that they are talking about 2026 before anything happens. Are airlines going to forgo expansion at the likes of MAN, EMA and LBA so as to commit to operations at an as yet unopened DSA - and with no guarantee it WILL actually be open in Spring 2026? Are the politicians clued up enough to realise how long it will take this time to recruit, and train all the required personnel, procure all the necessary equipment, and have it installed and tested, let all the required contracts with the likes of Swissport, who themselves then have to recruit (and possibly train) staff, not to mention let contracts for all the terminal retail outlets and then have them all built and stocked - and staffed.
None of this can even start until the operators contract is in place and a deal agreed, so all needs to be completed in around a year. 52 weeks isn't that long. Government security checks alone take up to 4 months before recruited staff can even be trained. They may be being over optimistic thinking the first passenger flights will be operational by Spring 2026, even if they do attract airlines.
Some interesting times ahead!